The complex of three concrete blocks was built by the Ministry of Defence in 1968 as training workshops for Dockyard apprentices.

The three-acre site was later taken over by City College Plymouth for use as a training centre.

But it was no longer needed due to the opening of the Regional Centre of Excellence for STEM (science, technology, engineering, maths) in 2017 and was put up for sale to help solve financial problems.

Leave a Reply

Your email address will not be published. Required fields are marked *

error

Enjoy this blog? Please spread the word :)

error: Copyright urbanexboi ltd